Chemical Grout Curtain for Groundwater Control During Deep Excavation at a Lakeside Wastewater Facility
A low-permeability grout curtain installed at the soil-structure interface to control groundwater and protect the adjacent structures, verified against a defined field-test acceptance criterion, allowing excavation to proceed

Overnight Structural Polymer Injection to Stabilize Cracked, Settled Airfield Pavement Around Live Operations
URETEK stabilized cracked, settling concrete pavement at a major Los Angeles airport using shallow, direct-under-slab polymer injection, working in short escorted shifts around live aircraft operations.

Emergency Overnight Slab Lift and Soil Stabilization Beneath an Active Airport Access Ramp
Ramp restored to grade and reopened to traffic within 12 hours of the initial call, before the Saturday morning rush

Multi-Depth Deep Injection Ground Improvement to Correct Interstate Pavement Settlement Above Buried Drainage Infrastructure
Roughly 170 linear feet by 24 feet of pavement stabilized across five injection elevations; completed in 10 days, five days ahead of schedule, and about $125,000 under budget

Targeted Deep Injection to Stabilize a Settling Commercial Building Slab and Fill Subsurface Voids
The affected slab areas were stabilized and voids filled across roughly 4,000 square feet in about three days, through small holes and without removing the existing concrete, with lift performed where the slab could respond safely

DCP-Guided Deep Injection to Arrest Settlement and Lift a Multi-Lane Roadway at a Rigid Box Transition
The pronounced dip was removed from the treated westbound lanes and the soils stabilized; completion profiles recorded up to 2.5 inches of upward movement westbound and 1.75 inches in the eastbound right lane, all through small drilled holes with no…

A Multi-Year, Panel-by-Panel Concrete Pavement Preservation Program for a North Texas Municipality
3,965 completed panels documented across two corridor trackers and 797,282 pounds of structural polymer recorded across three program trackers, from a pilot through a later term contract

Nighttime Deep Injection Ground Improvement to Raise a Settled Six-Lane Interstate Back to Grade
Up to six inches of settlement corrected across the affected lanes and shoulder in 12 night shifts, with no daytime lane closures and no post-injection milling required

Securing a Civic Landmark with Trenchless Curtain Grouting
No water ingress observed along the treated wall section after treatment and all verification tests passed, without delaying the construction schedule

Flood-Mitigation Grout Curtains at Floodwall Discontinuities
Treated gaps and transitions remained dry through tidal cycles, achieving a stable seal compatible with the facility's long-term flood-mitigation strategy, with no excavation and no disruption to ongoing operations

Subterranean Parking Structure Stabilization and Groundwater Curtain Installation
Bearing support restored, groundwater migration interrupted, and full building operations maintained throughout the work

Water-Ingress Mitigation in a Major Urban Vehicular Tunnel
Active leaks arrested at all treated locations, verification completed within the planned closure window, and tunnel returned to full service on schedule

Acrylate Gel Injection to Cut Off Water Ingress Through Leaking Expansion Joints in an Operational Tunnel
The 60-foot pilot segment held a continuous gel seal with no visible seepage at acceptance, with staged sequencing limiting migration into adjacent joints, all while the tunnel stayed operational, establishing the method for a broader program

DCP-Guided Deep Injection to Stabilize Weak Subsoils and Lift Settled Slabs at a Landfill Weigh Station
Weak subsoils stabilized under all four slabs and the entrance slabs raised about 1.6 and 2.5 inches with joints returned to level; exit slabs stabilized and lifted within safe limits, in two days without closing the station

Verified Chemical Injection Ground Improvement for Shallow Foundation Rehabilitation in a Historic Below-Grade Structure
Order-of-magnitude reduction in settlement at design load, from approximately 1.38 inches pre-injection to 0.07 inches post-injection, with bearing capacity and elastic response confirmed by testing

Trenchless Joint Sealing in a Canal Box Culvert Using Hydrophobic Polymer Injection
Water intrusion controlled at treated panel-to-panel seams, seepage pathways sealed, and the work completed from inside the culvert with no exterior excavation, no property disturbance, and no disruption to the surrounding canal corridor

Emergency Coastal Bluff Stabilization Over an Oceanic Void
Collapse risk eliminated, bearing capacity restored, void pathways sealed, and the site stabilized for permanent concrete fill operations, confirmed stable through the full warranty period with no additional intervention required

Coastal Seawall Leak Sealing and Soil Stabilization
Leak pathways sealed, backfill support restored, and the treated corridor returned to public use about 15 minutes after the final injection, with little or no excavation

Coastal Condominium Parking Garage Waterproofing and Soil Stabilization
Garage sealed from groundwater, loose sands densified, no new leaks observed, and the structure returned to a dry, usable condition with long-term protection against water migration

Municipal Marina Seawall Embankment Stabilization
All joints sealed, all identified voids completely filled, embankment stabilized without excavation or wall replacement, and the city reported being extremely pleased with the outcome

Grout Curtain and Adjacent Structure Protection During Deep Urban Excavation
Zero water infiltration at verification test locations, stable groundwater levels maintained outside the excavation throughout dewatering, and no recordable settlement at the adjacent structure

Deep Excavation Groundwater Control and Structural Protection at an Active Wastewater Treatment Plant
Significant reduction in excavation inflow, zero observed settlement at adjacent tanks or structures, and contractor maintained schedule through project completion, all with less site disruption than the originally planned approach

Coastal Marine Facility Soil Stabilization
Post-injection testing confirmed substantially higher soil stiffness and bearing capacity, with treated soils exhibiting strength comparable to compacted rock. Facility operations including crane lifts and boat traffic continued uninterrupted throu…

Seawall Sinkhole Stabilization and Roadway Protection
Voids behind the wall filled, backfill re-consolidated, and the sinkhole repaired, preserving the existing seawall and roadway. No new sinkholes have appeared since treatment

Emergency Water Inflow Repair Using Interior Injection Grouting
Inflow stopped by the end of the second shift, tunnel reopened on schedule each morning, and a documented QA/QC package delivered for engineering closeout and future asset management

URETEK Deep Injection to Seal Leaking Manholes on a 30-Inch Sanitary Trunk Line in a Congested Utility Corridor
Both manholes sealed in less than 4 hours with no excavation and no disturbance to the adjacent utilities. The city reported savings of more than 75% against the cured-in-place lining option it had considered.

URETEK Deep Injection to Stabilize and Lift a Resettling Sinkhole Repair Beneath a Downtown Roadway
Supporting soils stabilized and the asphalt lifted in 4 days, with no excavation and no heavy construction equipment, working 9:30 a.m. to 3 p.m. around school bus traffic for 3 nearby schools.

URETEK Deep Injection Ground Improvement to Increase Bearing Capacity Beneath Retained Spread Footings in a Convention Center Rebuild
More than 90,000 pounds of expanding structural polymer placed. Survey data reported in an engineering case history published on this project showed additional settlement stayed below the 1/4 inch criterion through the documented monitoring period, and.

URETEK Deep Injection to Seal Leaking Manholes and Reduce Wet-Weather Flow in a Municipal Sewer Collection System
All seven manholes treated in about 1.5 working days. High-pressure leaks stopped at the point of injection, flow dropped at both the treated and the downstream pump station, and the city reported an average of 26.91 fewer pump-runtime hours per week.

Deep Polymer Injection Relieves Hydrostatic Pressure and Stabilizes Saturated Soils Beneath a Competition Natatorium
The targeted stabilization was completed in less than two weeks during a scheduled break, addressing the saturated-soil zones and preserving the existing pool structure, with no interruption to the facility's regular events

URETEK Deep Injection to Seal a Precast Sanitary Sewer Manhole Against Inflow and Infiltration
One test manhole sealed and back in service within hours. The utility awarded a maintenance contract on the strength of it, and the project account reports dozens of additional manholes rehabilitated in the years since.

Deep Injection Ground Improvement to Realign a Settled Runway Serving Presidential Aircraft Operations
15 concrete slabs realigned and soft soils stabilized to 14 feet within a 60-foot by 88-foot work area.

URETEK Deep Injection Through an Active Concrete Railbed to Fill Voids and Redirect Subsurface Water
Between 100 and 150 linear feet treated per outage, roughly 400 linear feet in total.

Engineered Expanding-Polymer Ground Improvement to Meet a 2,500 psf Bearing Requirement Beneath a New Rail-Platform Retaining Wall
The sealed calculation put the improved soil-polymer mass at a weighted-average allowable bearing capacity of 2,551 psf, meeting the 2,500 psf design requirement, achieved within the existing footprint with no wider footing and no over-excavation beyond.

URETEK Deep Injection to Stabilize 20 Feet of Eroded Soil and Lift a Settled Railroad Crossing Back to Grade
Crossing back to grade and soils stabilized to 20 feet in 7 days, with zero rail downtime and the roadway worked one lane at a time.

Deep Polymer Injection Stabilizes a Weak Runway Subgrade and Extends Pavement Life Without Full-Depth Reconstruction
Subgrade modulus rose in five of six analyzed lots and cement-treated-base modulus in four; FAARFIELD indicated more than 20 years of remaining structural life for every lot tested; one of seven lots met the deflection target after seasonal correction.

Deep Injection Ground Improvement to Restore Support Beneath Structural Columns on Deteriorating Timber Piles
Post-injection DCP measurements indicated improved soil response at the tested locations, the excavated test column showed injected polymer through the intended treatment zone, and the facility engineers accepted the stabilization work.

URETEK Deep Injection to Fill Voids and Stabilize Sandy Soils Around Leaking Storm Culverts Beneath a Municipal Parkway
Both locations stabilized in 3 days against a 5-day schedule and within the project budget, with at least one lane open throughout. The prime contractor milled and overlaid the pavement afterward.

URETEK Deep Injection to Stabilize Settled Equipment Pads and Realign Ice Thermal Storage Units
Both pads brought within the 0.75-inch tolerance and both units returned to service the same day, with the equipment left in place and no excavation of the pads.

Request an Assessment