URETEK USA's Stitch-In-Time™ technology restores load transfer to jointed, cracked, spalled or otherwise damaged concrete highways, roads, taxiways and runways. URETEK's Stitch-In-Time™ System uses a series of half-inch wide saw-cut slots to position a ¼ inch thick composite insert. The slots and inserts are filled with sand and bonded into place with a hybrid high-density polymer. Rapid curing characteristics allow almost immediate vehicular or aircraft traffic restoration.

The Stitch-In-Time™ System for joint load transfer and concrete damage repair is faster and superior to existing dowel-bar retrofit technology. URETEK USA sales representatives and engineers are available nationwide to answer questions about this dramatic step forward in Concrete Pavement Restoration (CPR) technology.

Key Time Benefits:

  • Improved pavement performance due to stronger, more rigid joints than with traditional steel tie bar repair.
  • Added benefit of filling below pavement voids and joints with resin further improves ride quality across the joint.
  • Laboratory tests suggest that URETEK's joint repair system may repair joints better and be more economical than traditional steel tie bar repairs.
Additional Stitch-In-Time™ benefits:
  • Tie new, pre-cast concrete panels to existing concrete pavement
  • Convert asphalt roads into concrete (using the old roadway as base and setting pre-cast panels for the new surface)

Capabilities:

This process is for restoring load transfer to jointed, cracked, spalled or otherwise damaged concrete highways, roads, taxiways and runways. This system is far superior to the "steel dowel-bar retrofitting"; currently in use, in terms of cost, performance, and time.

Stitch-In-Time™ can also, be used to:

  • Tie pre-cast concrete repairs to existing concrete pavement
  • Convert asphalt roads into concrete (using the old roadway as base and setting pre-cast panels for the new surface)
  • Tie pre-cast bridge deck sections together.

Resources:

Case Studies:

 
URETEK USA Delivers:
 
Time Savings:
90% faster than competitive solutions
Project work completed in hours/days versus weeks/months
Fast installation, curing and cleanup

Minimal Disruption:
Minimizes or eliminates work zone delays
Work often done during off peak night time hours
Crews dismantle and remove work zones as they finish daily

Cost Savings:
Up to 75% less than replacement cost
10 Year material guarantee

Predictable Results:
75,000 successful projects worldwide
Precision adjustment to 1/8"
Hydro- insensitive - displaces under pavement water

Safety
Clean, organized worksite
Professionally trained & certified employees
Environmentally safe, inert product